When there are complicated tasks that require creative solutions and precise planning, the Neta Ofer Group is prepared, with skilled work teams and state-of-the-art equipment.
Water and sewage works
Executing projects with planning and creative thinking
Every project carried out by Neta Ofer is carried out with planning and evaluation, meeting the client’s requirements and within budget limits – requiring a combination of technical skills, broad vision and executive ability
Reactor cleaning, cleaning
Proper planning and skilled teams allow for shorter fault repair times
Cleaning wastewater sludge from a large reactor at the Ganir plant, including wastewater removal, reactor flushing – on tight schedules, rapid assessments, and work teams working in sequence to complete the project
Replacing water line 16 Tsol, Binyamina Local Council
Rehabilitation and replacement of water infrastructure
An old 1.4 km long, 16-barrel, asbestos-made agricultural water line that supplies water to farmers in the Binyamina, Givat Ada and Zichron Yaakov areas. Over the years, it had worn out and would often burst, damaging the regular water supply to farmers. The local council decided that it should be replaced with a modern line, as quickly as possible, while minimizing disruption to the farmers’ daily routine.
The Neta Ofer Group rose to the challenge and, with outside-the-box thinking and skilled teams, carried out the replacement in less than a month.
Line length 1.4 km + 7 crossings
Sewerage and drainage in municipal authorities, spring water
Municipal Maintenance Services Around the Clock
Neta Ofer Company provides the city of Tel Aviv, through the water company Mei Avivim, with maintenance services for the sewage and drainage network and maintenance of pumping stations and summer water.
As part of the service, Neta Ofer Group provides the municipality with 3 sewage treatment plants and 3 work teams that are available 24/7 to respond to malfunctions.
Airports Authority
Airport Infrastructure Improvement Project
Assessments and entry into the airport area, into the flight path area to perform emergency treatment on a leaking water line. A challenge that requires planning and coordination, assessments with extensive equipment, and professional treatment to prevent the shutdown of air activity
Beach bananas
Construction of a pumping station
To deal with the problem of slopes and to pump wastewater from the packing house into the central sewer, the Neta Ofer Group built a pumping station for the Beach Banana Company